    Walk thru after all the excavation
    6:04
    Grading for water flow around the house.
    6:23
    Fixing the grade of the entire pad, and digging footers
    6:42
    Excavator work!! Again!!
    14:03
    Power line path underway!
    3:10
    Culvert pipe and ramp to the lateral field
    6:27
    Footers clean! Time for rebar.
    1:20
    Moving my driveways and clearing the lateral field location
    8:36
    Ready to pour the footers!
    0:38
    Speed racer!
    0:33
    Excavation continues! This is the next week to 10 days worth of excavation!
    7:24
    First day with the dozer at the in-laws homestead
    7:47
    Aerial view of the homestead!
    1:27
    My side after the excavator
    0:19
    Taking down a big tree with my bobcat skid steer
    1:02
    A few friendly butterflies.
    0:12
    Fill in the hole! No long going to build a walkout basement house.
    2:58
    In-law homestead officially underway!
    15:50
    Ready for the Bulldozer
    9:37
    Installing our water heater for the shop apartment.
    8:34
    Kitchen sink, shutoff valves, and cabinet shelves
    5:23
    Countertops, acrylic pour
    5:34
    Putting up gutters over the doors.
    5:45
    Shower & cabinets & bathroom vanity stuff
    4:55
    Shower trim and countertops
    11:31