    Building 3 additional trusses
    7:38
    Wall Framing! Starting to really show some progress!
    7:00
    Dried in! The garage doors are up and wall framing is underway!
    8:44
    Finished the trim and the ridges!
    6:01
    Finished the side steel, soffit, and corners.
    8:09
    Almost finished with the steel! Pole Barn Construction!
    9:13
    Steel siding continues! Both ends and back finished!
    16:49
    Rat Guard in Place and wall steel is going up!
    15:29
    Finishing up the roof steel! 3 days of hard work!
    20:21
    Steel time! First day putting steel on the roof!
    10:52
    Windows and the walk through door framed and installed.
    14:33
    Lean to construction begins
    5:07
    Well drilled, final girts and purlings on the South side.
    7:27
    Bracing the trusses, nailing up girts
    8:01
    Pole Barn Construction - Concrete Pad Poured!
    5:15
    Plumbing and concrete prep for shop!
    10:15
    Putting the perlings up on the shop!
    5:04
    Pole Barn Construction continues - Trusses going up!
    9:09
    Shop Construction Continues! Temporary meter up, headers up, and starting the girts!
    17:37
    Pole barn construction, 21 posts set
    13:56
    Construction begins! Pole Barn!
    15:16
    Pressure treated lumber, trusses, steel all arrived! Finished road ditch(pretty much)!
    9:41
    Day 3-5 digging my basement
    11:10
    Welding a lock latch on the skid steer
    2:49
    Ditch work, culverts moved, and basement/shop pad started!
    8:11