TRAIN DRIVER'S VIEW PREMIERE: Heavy delays on the 110th anniversary for the Bergen Line

4 years ago
2

The Bergen Line was connected between East and West on November 27th 1909. The Line has undergone some changes over the years, but most parts are still intact. The biggest changes was done around Finse where they shortened the line by constructing two tunnels to increase the regularity and speed. The Line was hard to keep open during the winter as the track would be completely snowed down. This happened even when they were running two rotaries that was running back and forth.

I was running train 602 this day from Voss to Ål. The trains fro Oslo was heavily delayed due to signalling problems at the depot in Oslo.

The mountain pass also presented it from it's best winter wonderland! Winter is finally here!🚄Bergen Line information: https://goo.gl/SXknN6
🚞Flam Line information: https://goo.gl/T1HSya
🚦Signaling information: https://goo.gl/zjLmKk
🚆Line information and speed: https://bit.ly/2GkOxYL

Train Stops at:
Voss
Myrdal
Hallingskeid (on request)
Finse
Haugastøl
Ustaoset
Geilo
Ål

○ If you want to support the channel you can donate here
https://goo.gl/R2LLL1

CAMERA & EQUIPMENT I USE
○ Camera 1: https://amzn.to/2R4JQaS
○ 360° Camera : https://amzn.to/2DCfJQ9
○ SD Card: https://amzn.to/2LrrSMf
○ Mount: https://amzn.to/2ssAFqj
○ Power bank: https://amzn.to/2LBTVIH

And make sure to subscribe to my channel and tap that bell so you don't miss out on future content!

DISCLAIMER: Links included in this description might be affiliate links. If you purchase a product or service with the links that I provide I may receive a small commission. There is no additional charge to you! Thank you for supporting RailCowGirl so I can continue to provide you with content weekly-ish!

Loading comments...