Clearing lot, septic Install and clearing of lot. In advance of my twoAframe build. #twoaframes

2 years ago
1

First we cleared the approximate opening for the building. Although the backhoe would be going in later to clear it, I wanted to get a feel for the space before I marked the area to fully clear. This was done by chainsaws by myself and my buddy Eddie.

Our backhoe guy Francois came in did the septic install and further cleared the land perfectly. He is a maniac. It was late in the fall/early winter (the snow was falling), so we had no time to seed it.

I went up in April for the first time to inspect. It was fantastic. Some areas were wet and soggy, but it will dry out and improve with the grass. I managed to stake out the building(s). I also needed to measure all distances of the building to septic/boundary/high water mark etc. This was hopefully my last requirement in advance of a building permit.

Loading comments...