9/23 4th Day of Transformation
Before beginning the grading and filing I have to install a retaining wall to ensure it can withstand the weigh of all the dirt I will be adding for the new level of the bedding. I made sure to tie into the retaining wall and the cement that runs along the side of this wall. Also customer choose cedar stain. I gave them the highest quality of staining and the most natural grain lines to ensure a very natural finish. Ended the day by starting to add recycled dirt and begin the filling of the bedding.
1
view
9/25 5th Day of Transformation.
I begin the grading and also removing all living greens and removable of roots. Customer was around today. The in-laws came by to preview the work and the last look of the old. A lot of picking and digging.