Premium Only Content
![Kaohsiung Station 高雄車站 under construction [episode 08] 🇹🇼 (2021-04) {aerial}](https://1a-1791.com/video/s8/6/X/p/1/9/Xp19c.OvCc.jpg)
Kaohsiung Station 高雄車站 under construction [episode 08] 🇹🇼 (2021-04) {aerial}
Views of Kaohsiung Station construction site mid April 2021, Sanmin District, Kaohsiung City, Taiwan.
#Kaohsiung #station #construction #railway #StationBuilding #TrainStation #development #ZhongboBridge #publictransport #railway #infrastructure #documentation #architecture #scenery #TRA #landscape #urban #aerial #uav #drone #SanminDistrict #KaohsiungCity #Taiwan #Asia
Support the channel:
https://www.paypal.me/WalterHagemann
Stages of the (above ground visible) Kaohsiung Station 高雄車站 construction works are presented in several episodes.
Episode 08
Status as per 2021, mid April.
Zhongbo Bridge 中博高架橋 superstructure and piers have been completely removed. Scaffolding encasing the tall building being erected. Roof structure assembly has started (south-west). Station building underground work ongoing (north-west).
Video: https://youtu.be/u-0z9Q74UZc
Episode 07
Status as per 2021, early March.
Key event is the begin of dismantling Zhongbo Bridge 中博高架橋. The steel-concrete composite road bridge connected Jhongshan 1st Road in the south and Boai 1st Road in the north of the station's track and platform area. The temporary bridge went into operation in May 2003 and was closed for traffic at 00:00 o'clock of 27 February 2021. The bridge once had taken the vehicular traffic from a tunnel under the railway tracks, which was permanently closed in connection with the MRT station construction works. 06:00 o'clock on 2021-03-08 newly built Jhansi Road 站西路 was opened for traffic (west side of the new station building). The works for rerouting the traffic from the bridge to the street have been carried out within a tight schedule of about nine days. This became possible due to good planning of the activities and mobilization of plenty of construction equipment (including mobile cranes, excavators, asphalt milling machines, rollers, pavers, and rollers).
Video: https://youtu.be/Jodo0QNCS2U
Episode 06
Status as per 2021, mid February.
The building shell of the first steel frame high rise building is almost completely erected. Installation of the corrugated steel sheets of the floor slabs is ongoing (including some concreting). Access roads west of the station building have been paved and road marking is in place. Planting of vegetation on the former railway track has substantially proceeded.
Video: https://youtu.be/lepvJqYDVzs
Episode 05
Status as per 2020, early December.
Erection of the first steel frame high rise building is continuing. Steel members are being hoisted by mobile cranes. The curvilinear shaped canopy is developing. Vegetation zones on the former railway track are being prepared.
Video: https://youtu.be/BTIwkyDKX-Q
Episode 04
Status as per 2020, mid November.
Erection of the first steel frame high rise building has started. Steel members are being hoisted by mobile cranes. Support structures of the curvilinear shaped canopy are under construction. Roads and cycle paths at the vegetation zones on the former railway track are being prepared.
Video: https://youtu.be/0uhjnBNFghQ
Episode 03
Status as per 2020, early October.
Canopy construction and preparation of the former railway track area.
Video: https://youtu.be/45Vi0-GdYEM
Episode 02
Status as per 2020, end May.
Construction works below ground level are proceeding. Temporary site roads support the logistics of construction material and equipment. Corrugates steel sheets have been placed as permanent formwork for the canopy.
Video: https://youtu.be/i8uAz_w00dY
Episode 01
Status as per 2020, end March.
Construction works below ground level are proceeding. Temporary site roads support the logistics of construction material and equipment. Preparatory works are ongoing on the former track areas east and west of the station.
Video: https://youtu.be/ISEwyN3lMb4
************************************************
Architect’s project website:
https://www.mecanoo.nl/Projects/project/170/Kaohsiung-Station?d=0&t=0
Architectural rendering:
https://youtu.be/xnNJcV57cGk
************************************************
Music:
Over Time by Audionautix
License: Creative Commons Attribution 4.0 license. https://creativecommons.org/licenses/by/4.0/
Artist: http://audionautix.com/
Antarctica by Audionautix
License: Creative Commons Attribution 4.0 license. https://creativecommons.org/licenses/by/4.0/
Artist: http://audionautix.com/
-
LIVE
LFA TV
13 hours agoBREAKING NEWS ALL DAY! | TUESDAY 9/30/25
3,709 watching -
LIVE
The Shannon Joy Show
1 hour agoWWE DC! Chuck The Cuck Schumer Takes On Fat Boy Trump In A Budget Battle. Live W/ David Knight
179 watching -
LIVE
Grant Stinchfield
31 minutes agoThe Shocking Charts That Change Everything About What you Thought About Vaccines!
87 watching -
1:01:24
VINCE
3 hours agoDemocrats Can't Keep This Sex Criminal Locked Up | Episode 136 - 09/30/25
197K158 -
1:59:05
Badlands Media
8 hours agoBadlands Daily: September 30, 2025
37.4K19 -
LIVE
The Big Mig™
2 hours agoPeace In The Middle East Or War?
4,722 watching -
DVR
The State of Freedom
4 hours ago#337 What’s Behind the LA GOP Dysfunction? Insiders, Denialists & Deplorables
19.1K3 -
1:42:59
Dear America
3 hours agoCharlie’s Killer Fights For NO DEATH PENALTY!! NOT HAPPENING!! + Gov Shutdown Imminent!!
138K94 -
2:47:35
Right Side Broadcasting Network
5 hours agoLIVE REPLAY: President Trump and Pete Hegseth Address Military Leaders at Quantico - 9/30/25
102K98 -
1:32:46
The White House
3 hours agoPresident Trump Delivers Remarks to the Department of War
49.2K12