Premium Only Content
![Kaohsiung Station 高雄車站 under construction [episode 04] 🇹🇼 (2020-11) {aerial}](https://1a-1791.com/video/s8/6/o/T/y/7/oTy7c.OvCc.jpg)
Kaohsiung Station 高雄車站 under construction [episode 04] 🇹🇼 (2020-11) {aerial}
Aerial views of Kaohsiung Station construction site mid November 2020, Sanmin District, Kaohsiung City, Taiwan. (Brief update)
#Kaohsiung #station #construction #railway #StationBuilding #TrainStation #development #PublicTransport #railway #infrastructure #documentation #architecture #scenery #TRA #landscape #urban #mecanoo #aerial #uav #drone #SanminDistrict #KaohsiungCity #Taiwan #Asia
https://www.paypal.me/WalterHagemann
Stages of the (above ground visible) Kaohsiung Station 高雄車站 construction works are presented in several episodes.
Episode 06
Status as per 2021, mid February.
The building shell of the first steel frame high rise building is almost completely erected. Installation of the corrugated steel sheets of the floor slabs is ongoing (including some concreting). Access roads west of the station building have been paved and road marking is in place. Planting of vegetation on the former railway track has substantially proceeded.
Video: https://youtu.be/lepvJqYDVzs
Episode 05
Status as per 2020, early December.
Erection of the first steel frame high rise building is continuing. Steel members are being hoisted by mobile cranes. The curvilinear shaped canopy is developing. Vegetation zones on the former railway track are being prepared.
Video: https://youtu.be/BTIwkyDKX-Q
Episode 04
Status as per 2020, mid November.
Erection of the first steel frame high rise building has started. Steel members are being hoisted by mobile cranes. Support structures of the curvilinear shaped canopy are under construction. Roads and cycle paths at the vegetation zones on the former railway track are being prepared.
Video: https://youtu.be/0uhjnBNFghQ
Episode 03
Status as per 2020, early October.
Canopy construction and preparation of the former railway track area.
Video: https://youtu.be/45Vi0-GdYEM
Episode 02
Status as per 2020, end May.
Construction works below ground level are proceeding. Temporary site roads support the logistics of construction material and equipment. Corrugates steel sheets have been placed as permanent formwork for the canopy.
Video: https://youtu.be/i8uAz_w00dY
Episode 01
Status as per 2020, end March.
Construction works below ground level are proceeding. Temporary site roads support the logistics of construction material and equipment. Preparatory works are ongoing on the former track areas east and west of the station.
Video: https://youtu.be/ISEwyN3lMb4
************************************************
Architect’s project website:
https://www.mecanoo.nl/Projects/project/170/Kaohsiung-Station?d=0&t=0
Architectural rendering:
https://youtu.be/xnNJcV57cGk
************************************************
Music:
Ben by William Rosati
Youtube Audio Library
-
14:13
Clickbait Wasteland
13 hours ago $2.22 earnedAsking New Yorkers Who they Support for Mayor: Harlem
29.9K26 -
19:55
The Rad Factory
15 hours ago $0.48 earnedCan I Fix My Fire Damaged F1 Car?
3.71K1 -
1:26:22
Dialogue works
2 days ago $0.20 earnedScott Ritter: Russia Just DEFIED the U.S.: We'll End the War on OUR Terms!
3.35K7 -
LIVE
BEK TV
23 hours agoTrent Loos in the Morning - 8/01/2025
296 watching -
13:08
Dad Saves America
13 hours ago $0.86 earnedTeachers Unions Play Politics While Students Lag Behind - Poisoning of the American Mind: Pt 4
11.4K11 -
20:05
Preston Stewart
13 hours ago $1.59 earnedCrimea Raid to Chasiv Yar Fight
10.9K8 -
8:11
Millionaire Mentor
15 hours agoTulsi Gabbard and Leavitt DOUBLE-TEAM Kaitlan Collins in FIERY Exchange
16.1K6 -
46:02
Coin Stories with Natalie Brunell
1 day agoWhat They’re Hiding About the Economy | Natalie Brunell with Danielle DiMartino Booth
42K13 -
12:12
GritsGG
14 hours ago23 Warzone Wins in a Row! (Cypher AR)
90.1K3 -
2:12:07
Side Scrollers Podcast
21 hours agoCULTURE SHIFT CAUSES MELTDOWNS + MASSIVE CENSORSHIP EFFORTS RAMP UP | SIDE SCROLLERS LIVE
26.8K12