Singapore

3 years ago

Welcome back to our weekly discussions about all things Construction, Equipment and Technology. In this episode we are talking about a fantastic project we have been involved in with these material placers in Singapore

Code named "The Singapore Sling" this project has been nothing short of amazing. Some of the statistics. 5 machines in total. 3 x AT7 and 2 x TR20. Potential to move up to 9,000 cubic meters every 24 hours with all 5 units running. 5 machines clocked up 25,000 hours in 21 months of operation.

We talk about a lot of the behind the scenes in making a project like this work, the data that has been collected. Some modification to the product working in this environment. As well as some improvements that have been made as a result of this project.

It is nothing short of amazing and the project is amazing but the equipment has been outstanding. A true testament to the equipment, the technology behind it and the guys putting it together. Slingers Solve Problems, no doubt about it and this project would have to be one of the biggest problems to solve to date.

Please enjoy and as always leave a comment about some of the problems you have come across on your projects and how you have overcome them over the years. Until next time, be safe, look after your mates and always strive for excellence.

Loading comments...