Rows of 7..patio progress#10

Enjoyed this video? Join my Locals community for exclusive content at afterchrist.locals.com!
2 years ago
17

Sand, pavers, tampering. I'm moving a lot of weight here. I'm working over several days, mainly evenings and weekends to get this done. The summer evenings are long in Indiana, so I have a lot of daylight. I sometimes work upto 9:30 pm on my patio. Eventually I will explain why.
As I payed the 1st row, I measured for 8ft, but realized I could only fit 7. The 8th block was 1/2 inch over my "single mom retaining wall". No good. God gave me a solution. Make it 7ft, set the paver edging in place to hold both the sand and paver block in place. I will have a uniform edging/space for decorative pond pebbles. None of this was planned. I'm moving along with the Spirit.

Loading comments...