Day 4 - Massive Remodel

3 years ago
34

Main differences today - more stuff ripped out and 3 new heated floors mats and wires installed. Mudroom electrical wires need to be moved to the other side of the door. Glad we caught that before concrete went in. Friday they will put in the self leveling concrete. We also looked at the mini wall in the kitchen to take it down to a post as the kitchen table is designed / cut for a post (not a wall).

Loading comments...