© 2014 Pursanova™ - Turnkey Industrial RO System - 2/6

4 years ago
3

2/6 - © 2014 Pursanova Ltd., Inc - All Rights Reserved.

This system will be installed as follows:

1) Pursanova Electronic De-Scaler - will be installing 2 of them at the beginning
2) Pursanova PursaLex Tube PN-60
3) Reservoir water tank before the system to hold water gathered fem the well
4) Pursanova Turnkey Industrial RO System - PN-6600LX
5) Holding Product RO Tank after the system
6) Pursanova PursaLex Tube PN-60 at the Product Tank to activate the water by
recirculate the water through the tube

Loading comments...