The Premise is Wrong

6 months ago
54

Giza Pyramid blocks were raised simultaneously on and over all four sides of a Pyramid, NOT consecutively. Consecutively meaning in a single line at one place, where one block is following another.

The engineering logistics of CONSECUTIVE traffic of blocks raised within the documented twenty year time-frame rules out ALL ramp and water-shaft canal theories which all have "one block follows another' illogical approach. Blocks were moved SIMULTANEOUSLY over all those STEPS you see of all Giza Pyramids.  Four-lobe pinion-pulleys were used on and over ALL available horizontal STEP surface area. Hoist one block per hour over an eight hour day. Forty pulleys, ten per side, raise 320 blocks.

Over a year, 365 days 116,800 blocks are raised. Over Twenty years 2,336,000 blocks have been raised. The method is known in our modern world as Rack and Pinion mechanical engineering. Those hundreds of limestone STEPS can be termed RACKS. The Pinions were fabricated from imported Lebanese Cedar timber under the supervision of Chief Carpenter Inty Shedu who was entombed on the Giza Plateau. Inty Shedu's four tomb statues are exhibited in the Cairo museum. The Four-Lobe Pinion-Pulley has an innate mechanical advantage of 2.8 (MA=2.8) which means a 2500kg Pyramid block is raised with an input effort of 900kg.
Search: haitheory
https://haitheory.com/

Loading 2 comments...