Premium Only Content

Chapter 54 1970 TransAm Clone - Prepaint assembly
Installed radiator support.
Installed front fenders.
Mocked up electrical components for glove box panel.
This panel will contain the multiply modules for the DAKATO DIGITIAL dash gauges. Besides standard gauges
there will be trans temp, oil temp, diff temp, outside temp, and compass
Fabricated ECU panel to mount on top of trans tunnel.
Discussed module and fuse placement on the board
Researched and wrote down how everything will work and be hooked up for the Holley and Dakota digital systems
Fit driver and passenger doors and adjusted for door gap repair.
Final installation of dash components
Prep and paint front portion of roll bar for installation.
Installed 2 front points and headache roll bar back into vehicle
Prepped roll cage floor pads (removed primer powder coating)
Welded roll cage and pillar panel designed and mocked up gusset that will be welded from the front bars to the A pillar
Started on trunk fitment and gapping.
Trunk lid gap set to 3/16"
-
LIVE
Film Threat
20 hours agoMARVEL ZOMBIES! PLUS DEXTER RESURRECTION | Hollywood on the Rocks
73 watching -
1:06:51
Jeff Ahern
1 hour agoNever Woke Wednesday with Jeff Ahern
3.14K -
13:43
The Kevin Trudeau Show Limitless
6 hours agoClassified File 3 | Kevin Trudeau EXPOSES Secret Society Brainwave Training
11.2K4 -
10:04
Freedom Frontline
3 hours agoBernie Sanders EXPLODES After Starbucks CEO FIRES BACK With Truth
101 -
LIVE
SportsPicks
4 hours agoCrick's Corner: Episode 75
52 watching -
1:06:30
LindellTV
2 hours agoMIKE LINDELL LIVE AT THE WHITE HOUSE
10.8K -
1:05:33
Russell Brand
4 hours agoTrump Goes NUCLEAR on China - accuses Xi of CONSPIRING against US with Putin & Kim - SF627
111K54 -
1:14:47
Sean Unpaved
4 hours agoTrey Wingo's Gridiron Grab
17.2K1 -
13:07
Silver Dragons
22 hours agoBullion Dealer Reacts to SILVER PRICE SURGING!
8.84K6 -
1:06:28
Timcast
4 hours agoTrump Admin Threatens GOP Who Vote To Release Epstein Files
146K129