Premium Only Content

Wye Track Realignment - Part 1
Visit our store! https://santaferatonsub.square.site/
We decided to enlarge the reversing section of our Wye so we could turn an entire train around. The job entailed a lot more work than we thought.
After we got into the project and started laying the new track, we decided to give the right-hand curve of the Wye a wider radius. This would make it easier for large locomotives like Madame Queen to pass through the small #4 wye switch. Realigning the right-hand curve of the wye also required us to remove more of the original reversing section track to make everything come out right. The job ended up taking us (my son and I) 6 days.
All the steps required to complete this task are in this video and will be a handy reference for anyone wanting to make track changes to fully completed scenery areas of their model railroad. Just like any remodeling project, you must tear out the old before you can install the new. We spent a lot of time tearing out the original HO scale track, roadbed, roads, trees etc. down to the original Styrofoam base of our benchwork.
Then we had to level out the areas where new track would be installed and start putting everything back together.
Final testing of the newly realigned wye track was done with AT&SF 2-10-4 Steam Locomotive #5000 (Madame Queen). Madame Queen is the largest locomotive used on our layout. Her ten-coupled drivers are a great way to test new curves and turnouts.
The Wye Realignment is presented in two parts because there is almost two hours of footage covering this project. We hope the information and techniques we used to realign our wye will help you with any changes you want to make on your model railroad. Let us know if it does.
VIDEO CONTENTS:
00:00 Introduction
00:38 Removing original track, road bed and ground cover.
29:45 Start test fitting new cork roadbed with straight pins.
37:05 Making the RH curve radius wider.
49:00 Cutting out ground cover for new reversing section roadbed.
51:03 Removing ground cover for new reversing section roadbed.
56:13 Test fitting cork roadbed for new reversing section route.
59:34 Checking distance between new roadbed.
RECOMMENDED LINKS:
1. https://youtu.be/4ivpv29FCJY 2. https://youtu.be/ijglGJsRq7Q
-
1:03
Santa Fe's Raton Subdivision Model Railroad
15 days agoTrain Operations Ep 1 Preview
11 -
9:35
Michael Button
12 hours ago $0.06 earnedStunning New Discovery Completely Rewrites Human Evolution
1768 -
9:10
Faith Frontline
12 hours agoJim Caviezel Was STRUCK By Lightning While Playing JESUS… Twice.
535 -
10:03
ARFCOM News
16 hours ago $0.21 earnedDid Colt Help Canada Destroy Guns? | The Witch Hunt For SAF | Sensitive Places Goes To SCOTUS
2565 -
LIVE
BEK TV
19 hours agoTrent Loos in the Morning - 10/09/2025
171 watching -
10:44
VSOGunChannel
13 hours agoANTIFA Handbook Author Flees the USA
1893 -
LIVE
The Bubba Army
21 hours agoPeace In The Middle East? - Bubba the Love Sponge® Show | 10/09/25
3,000 watching -
LIVE
Times Now World
10 days agoLIVE Jeffrey Sachs | Netanyahu Turned U.S. Military Into His Own War Machine | Times Now World
115 watching -
LIVE
PudgeTV
8 hours ago🔵 God of War: Ragnarok - Gaming on Rumble | Rage Inducing Gifted Games End of Week 1
205 watching -
LIVE
SynsFPS
3 hours ago|🔴COD Plays/Fails🔴|
57 watching