CVC-1 5 sets in Mongolia Factory

5 months ago
1

Installation location: Mongolia
Equipment model: CVC-1
Equipment height: 3.5m
Number of units: 5 sets
Transported products: bags
Background for installing the elevator:
Due to the increase in order volume, the production scale needs to be expanded, so a layer is added in the workshop to increase storage and transportation space
Effects achieved:
The inlet conveyor line and the production line are connected, and the packaged cartons automatically enter the elevator through the conveyor, and automatically rise to the mezzanine, and are transported to the warehouse through the conveyor.
Value created:
The capacity is 1,000 per hour per unit, 40,000 cartons per day, which fully meets the needs of daily production and peak season production.
Cost savings:
Wages: 20 workers carry, 20*$3000*12usd=$720,000usd per year
Forklift costs: several
Management costs: several
Recruitment costs: several
Welfare costs: several
Various hidden costs: several

Loading comments...