Continuing the work on the woodshed, finished exterior insulation

2 months ago
55

We continued cutting more logs on the sawmill to produce the 1”x3” boards we need for the woodshed walls. Cut up for firewood, what couldn’t be used for the woodshed. Being that the mornings are still a little chilly, we worked on finishing the exterior insulation on the rest of the original structure to give our walls roughly a R25 insulation value. By screwing 2”x4” boards on flat and installing foam insulation between those boards and then covering it up with plywood. After that we continued working on the woodshed as we will need to have a place to put the firewood that we’ve been cutting that is piling up down by the sawmill.
Thank you for joining us on this Journey and please subscribe if you haven’t already and feel free to share this video with anyone who might like this content.

Happiness by Mixaund | https://mixaund.bandcamp.com
Music promoted by https://www.free-stock-music.com

Loading comments...