HOMESTEAD BRIDGE FAIL

3 months ago
12

So at the advice of our original contractor we had this bridge made with 4 culverts. Unfortunately we learned the hard way how easily these smaller culverts can become blocked with debris. This caused major erosion and flooding as the water flows over the front of the bridge. Soon we’ll have this entire bridge ripped out and replaced with a bridge that will allow debris to flow under and through it.

Loading 1 comment...