Finishing off the concrete pathway prep and more on the winch. Ep14 Part2

7 months ago
111

The concrete pathway area is now prepared for the glow in the dark exposed slab.

Dowel pins are in, boxing is now in place. Thought it was time to get the electrical work sorted out for the remote so i don't have cables dangling down into the bunker anymore. not long now and i can start tunneling.

Loading 1 comment...