OREGON - I-5 Bridge MONEY PIT

9 months ago
22

The I-5 Bridge needs to be replaced. Our government has spent $261 million to STUDY the bridge replacement. $65 million was spent in 2009 and in 2013 $196.6 million was spent. All of it spent with no conclusive plan. Earl Blumenauer insisted that the bridge include light rail which in the design made it impassable by large ships. So, back to the drawing board. Now government officials say it will cost
$6 BILLION to replace and are proposing to place tolls on the bridge pre-completion to fund the construction.

If are in opposition of tolling and want to ability to VOTE before tolls are enacted go to:
https://votebeforetolls.org/
Download and print the petition and get signatures to get it on the ballot.

Follow Oregon Citizen at
Twitter: https://twitter.com/oregoncitizen_
Instagram: https://www.instagram.com/oregoncitizen

If you have a story about living in Oregon or you want to expose government corruption email: oregoncitizennews@protonmail.com

Loading comments...