Premium Only Content

How To 2nd Fix A Fuse Board With SPD Tutorial 🧑🔧
Second-fixing a fuse board, also known as a consumer unit in the UK, is the process of making the final connections, ensuring everything is in its proper place, and testing the unit for safe operation. Here's a step-by-step guide to second-fixing a fuse board. Please note that this is a simplified overview, and working with electrical installations should only be done by qualified individuals:
Safety First: Always ensure the main power supply is turned off before working on a fuse board. It's best to use a voltage tester to double-check there's no current flowing to the board.
Mount the Consumer Unit: If not already in place, mount the consumer unit securely to the wall.
Install Circuit Breakers:
Slot in the necessary circuit breakers (MCBs, RCCBs, or RCBOs) according to the planned layout of circuits.
Make sure each breaker matches the current rating for its specific circuit.
Connect the Main Earth and Neutral Bars:
Attach the main earth (ground) wire to the earth bar.
Connect the neutral wires from the different circuits to the neutral busbar.
Connect the Live Wires:
Connect the live wires from the different circuits to their respective circuit breakers.
Connect the Main Live and Neutral:
Attach the main live wire (coming from the electricity meter or main cut-off switch) to the main switch or RCD of the consumer unit.
Attach the main neutral wire to the neutral bar.
Neatness and Management:
Use cable trunking or conduit, if necessary, to manage and protect wires leading into the consumer unit.
Ensure cables are neatly organized within the consumer unit, with no excess slack.
Labelling: Clearly label each circuit breaker with its corresponding area or appliance (e.g., "kitchen sockets," "upstairs lights").
Testing: Before powering on, use a continuity tester to check connections. Once powered on, use a loop impedance tester and insulation resistance tester to ensure everything is safe. Check RCDs with an RCD tester.
Power On: Once satisfied with all connections and initial tests, switch the main power back on and check each circuit's functionality.
Final Checks and Certification:
Conduct final safety checks.
In the UK, electrical work must adhere to the Wiring Regulations (BS 7671). After installation, it is necessary to fill out an Electrical Installation Certificate or Minor Work Certificate, as appropriate, and have the installation checked by a qualified person or inspector.
Warning: Working on a consumer unit and electrical circuits can be hazardous. Always consult with, or hire, a qualified electrician. Electrical installations in the UK must meet specific regulatory standards, and unauthorized or incorrect installations can be both illegal and dangerous.
-
16:29
Tool Box Talk For Electricians
4 months agoHow Electricians Can GROW Their Business Using Social Media 💼📱
291 -
LIVE
Sean Unpaved
2 hours agoBills-Dolphins TNF Battle, Steelers' D in Crisis, & Coaching Hot Seat Alert!
285 watching -
LIVE
Human Events Daily with Jack Posobiec
54 minutes agoHUMAN EVENTS DAILY WITH JACK POSOBIEC
1,238 watching -
LIVE
LindellTV
35 minutes agoMIKE LINDELL RESPONDS TO JIMMY KIMMEL "INDEFINITE SUSPENSION"
294 watching -
1:57:27
The Charlie Kirk Show
2 hours agoMegyn Kelly Remembers Charlie + Jimmy Kimmel Off the Air | 9.18.2025
147K57 -
LIVE
SternAmerican
23 hours agoElection Integrity Call – Thurs, Sept 18 · 2 PM EST | Featuring Rhode Island
62 watching -
4:22
Michael Heaver
2 hours agoLabour Face Brutal UK WIPEOUT
12 -
10:32
Faith Frontline
17 hours agoKenneth Copeland EXPOSED as America’s CREEPIEST Pastor Yet
612 -
4:33:50
Right Side Broadcasting Network
21 hours agoLIVE REPLAY: President Trump Holds a Press Conference with Prime Minister Keir Starmer - 9/18/25
52.8K38 -
1:01:35
The Rubin Report
3 hours agoJimmy Kimmel Humiliated as NY Post Exposes His Dark Reaction to Being Canceled
49.2K88