Premium Only Content

How To 2nd Fix A Fuse Board With SPD Tutorial 🧑🔧
Second-fixing a fuse board, also known as a consumer unit in the UK, is the process of making the final connections, ensuring everything is in its proper place, and testing the unit for safe operation. Here's a step-by-step guide to second-fixing a fuse board. Please note that this is a simplified overview, and working with electrical installations should only be done by qualified individuals:
Safety First: Always ensure the main power supply is turned off before working on a fuse board. It's best to use a voltage tester to double-check there's no current flowing to the board.
Mount the Consumer Unit: If not already in place, mount the consumer unit securely to the wall.
Install Circuit Breakers:
Slot in the necessary circuit breakers (MCBs, RCCBs, or RCBOs) according to the planned layout of circuits.
Make sure each breaker matches the current rating for its specific circuit.
Connect the Main Earth and Neutral Bars:
Attach the main earth (ground) wire to the earth bar.
Connect the neutral wires from the different circuits to the neutral busbar.
Connect the Live Wires:
Connect the live wires from the different circuits to their respective circuit breakers.
Connect the Main Live and Neutral:
Attach the main live wire (coming from the electricity meter or main cut-off switch) to the main switch or RCD of the consumer unit.
Attach the main neutral wire to the neutral bar.
Neatness and Management:
Use cable trunking or conduit, if necessary, to manage and protect wires leading into the consumer unit.
Ensure cables are neatly organized within the consumer unit, with no excess slack.
Labelling: Clearly label each circuit breaker with its corresponding area or appliance (e.g., "kitchen sockets," "upstairs lights").
Testing: Before powering on, use a continuity tester to check connections. Once powered on, use a loop impedance tester and insulation resistance tester to ensure everything is safe. Check RCDs with an RCD tester.
Power On: Once satisfied with all connections and initial tests, switch the main power back on and check each circuit's functionality.
Final Checks and Certification:
Conduct final safety checks.
In the UK, electrical work must adhere to the Wiring Regulations (BS 7671). After installation, it is necessary to fill out an Electrical Installation Certificate or Minor Work Certificate, as appropriate, and have the installation checked by a qualified person or inspector.
Warning: Working on a consumer unit and electrical circuits can be hazardous. Always consult with, or hire, a qualified electrician. Electrical installations in the UK must meet specific regulatory standards, and unauthorized or incorrect installations can be both illegal and dangerous.
-
18:01
Tool Box Talk For Electricians
10 months agoElectrifying Christmas Gift Ideas from a Seasoned Electrician!
321 -
2:56:00
Laura Loomer
5 hours agoEP150: New Yorkers Brace For Islamic Takeover After Mayoral Election Debate
68.4K56 -
1:35:37
Man in America
10 hours agoThe Forbidden Medicine of Light: Why is Big Pharma HIDING This From Us?
31.2K7 -
LIVE
BlackDiamondGunsandGear
3 hours agoAFTER HOURS ARMORY / BUILDING GUNS ARE ILLEGAL? / Marine Gun Builder RETURNS!!
168 watching -
Damysus Gaming
3 hours agoARC Raiders - SERVER SLAM TIME!!!! LFG!!!
18.8K -
1:04:10
The Connect: With Johnny Mitchell
6 hours ago $0.01 earnedTucker Carlson's INSANE Take On Civil War In America, Calls For Fascism
14.2K20 -
LIVE
DLDAfterDark
5 hours agoThe Return of Marine Gun Builder? MGB, DLD, BDG&G After Hours Armory
284 watching -
28:39
Afshin Rattansi's Going Underground
1 day agoDonald Trump’s Gaza Peace Plan: A Pivotal Moment or Farce? (Palestinian Deputy Foreign Minister)
23.1K6 -
3:31:29
SavageJayGatsby
6 hours ago🔥 Spicy Saturday – Let's Play: Prison Life 2🔥
38K2 -
4:34:18
cosmicvandenim
12 hours agoCOSMIC VAN DENIM | WARZONE HORROR
14.3K1