Minimum of 2 inches of foundation visible below stucco

1 year ago
9

The amount of foundation that should be visible below a weep screed on a foundation wall can vary depending on local building codes and regulations. However, a common rule of thumb is that at least 2 inches of foundation should be visible below the weep screed.

A weep screed is a metal flashing that is installed at the base of the exterior stucco or veneer on a building. It is designed to allow water to drain away from the building while also providing ventilation to help prevent moisture buildup and potential damage.

The weep screed should be installed level and at the correct height to allow for proper drainage and ventilation. In general, it should be installed at least 4 inches above any finished grade or paving to prevent water from pooling and causing damage to the structure.

To ensure that the weep screed is installed correctly, it is important to follow local building codes and regulations and to consult with a licensed professional if you have any questions or concerns.

#stucco #homeinspection #hometips #grading #foundation #exteriordesign

Loading comments...