1957 Ford Ranchero Project (Part 6) "Putting The Engine Back Together"

1 year ago
19

We get everything cleaned up and after installing the upgraded ARP oil pump drive shaft, we install a new front seal in the timing cover then install the timing cover on the engine along with the water pump and oil pan all with new gaskets. Then we install the crankshaft dampener and other pulleys, when we find the power steering pulley is rubbing against the power steering pump. After installing a washer as a shim, there's no more rubbing. We also find they installed a temp switch that they wired to the temperature gauge causing it not to work properly. We also picked up the front bumper from the chroming company.

Loading comments...