ich is called: control account, resource decomposition structure (RS), planning combination (plnningpkge) and planned activity (sheuletivity). 53. The following statements about rolling planning are correct, In addition, rolling planning is a form of gradual improvement of planning. The planned activities of the project should be at the same level of detail during the project life cycle. During the early strategic planning, the level of detail of activities only reaches the milestone level. The work to be carried out in the last two reporting periods should be planned in detail when the work of the current period is nearly completed