MyZeil Shopping Mall 🇩🇪 (2022-08) {slideshow}
Views of the MyZeil shopping center in Frankfurt am Main, Hesse, Germany.
MyZeil is a shopping center located in the downtown area of Frankfurt am Main, Germany. It is part of the Palaisquartier building complex and serves as the entrance to the Zeil shopping street. The center was officially opened on February 26, 2009, by the then-mayor of Frankfurt, Petra Roth.
The MyZeil building has six floors and features the longest freestanding indoor escalator in Europe, measuring 42 meters. The entire complex is covered by a structure made up of around 3,200 triangular glass elements and has a gross floor area of 77,000 square meters, with approximately 52,000 square meters dedicated to retail space in the lower three levels. The anchor tenants include a REWE supermarket (groceries) located in the basement, Anson's Herrenhaus (men's clothing retailer with leading fashion labels) spread over three levels, and Saturn (electronics and home appliances) occupying 7,500 square meters on the third and fourth floors. The upper levels contain a "Gastro-Boulevard" with restaurants, a Fitness First club with a high-altitude swimming pool, and a play and childcare area for children.
MyZeil was designed by architect Massimiliano Fuksas from Rome, with the structural design of the steel and glass construction handled by the engineering firm Knippers Helbig from Stuttgart. Rainwater from the nearly 6,000 square meters of roof surface is collected, cleaned, and reused in the building's water system. The construction design has some weaknesses, such as the need to protect the main entrance from falling ice and snow in winter, which led to the installation of a fixed roof over the entrance in 2013.
The shopping center has a large parking garage with 1,390 spaces on four levels, 900 of which are available to the public. It is open continuously, including on Sundays and holidays. MyZeil is well-connected to transportation, with access via the Hauptwache train station and two subway stations. The center has a total of six levels, including a REWE supermarket and the entrance to the parking garage on the lower level. The largest Saturn store in Frankfurt occupies 7,500 square meters on the third and fourth floors.
#MyZeil #mall #frankfurt #germany #architecture #slideshow
Music:
Beckoning by Telecasted
YouTube Audio Library
22
views
Bird Feeder View 🇩🇪 (2022-09)
Watch birds coming to the backyard bird feeder in late summer, Hesse, Germany.
Music:
1 HOUR _ _Echoes In The Canyon_ _ No Copyright - Flute Meditation_ Relaxation_ Ambient Music by Dandelion Meditation
https://youtu.be/dDTYv-F20sE
2
views
Blossoming of the Trees at Zen Park 🇹🇼 (2023-03) {aerial}
Views of the blossoming trees at Zen park 禪公園, Niaosong District, Kaohsiung City, Taiwan.
#park #spring #blossom #PinkShowerTree #CassiaBakerianaLinn #park #aerial #NiaosongDistrict #KaohsiungCity #Taiwan #Asia
Music:
Yiruma - River Flows in You|Lily Flute Cover _ Piano Instrumental Backing by Lily Flute
https://youtu.be/Puxab6UicBA
5
views
Tranquil Garden Pond 🇩🇪 (2022-09)
Static camera views of a tranquil garden pond, with water lilies, goldfish and fountain located in Hesse, Germany.
Music:
Schubert "Trout" Quintet, 4th Movement by Schubert Ensemble
https://youtu.be/HwbWvGtaZGo
2
views
Construction of Temple Extension Building, episode 3 🇹🇼 (2023-03) {aerial}
Construction of Extension Building
Dharma Drum Mountain Zi Yun Temple 法鼓山紫雲寺
Niaosong District, Kaohsiung City, Taiwan
Part 3 covers 2023-03, floor 10, topping-out ceremony
Construction info:
Contractor: Ruentex Co., Ltd., New Taipei City
Architect and designer: Wen-sheng Li, Taipei City
Chapters:
00:00 Intro
01:12 Topping-out ceremony (2023-03-11)
08:01 Aerial views of the building (2023-03-12)
29:11 Outro
2
views
Visiting Exotenwald and Wachenburg in Weinheim 🇩🇪 (2022-09)
Footage of a walk through Exotenwald (forest) and at Wachenburg (castle), Weinheim, Baden-Württemberg, Germany.
Weinheim, a charming town located in Baden-Württemberg, Germany, is known for its beautiful natural scenery and impressive architecture. Among the town's most famous landmarks are the two castles, Windeck and Wachenburg, which have very different histories but offer breathtaking views of the Rhine Valley and the Palatinate Forest. The town's nickname is Zweiburgenstadt, which means "the town of two castles."
One of the town's most visited attractions is the Exotenwald Weinheim, a forest arboretum located beside the Schlosspark. The arboretum spans about 60 hectares and is open daily to visitors free of charge. Established in 1871 by Christian Friedrich Gustav Freiherr von Berckheim, former Minister of State and Großhofmeister at the court in Karlsruhe, the arboretum is home to a vast collection of exotic trees and plants from around the world. The Exotenwald Weinheim is a favorite among locals and visitors alike, especially during the fall season when the forest transforms into a magical and enchanting place.
The Wachenburg, on the other hand, is a castle built at the beginning of the 20th century and is not an "old" castle built for military purposes but a gathering place for corps students. It is located above the town and offers stunning views of Weinheim, Rhine river plain and the surrounding area. The castle is a popular spot for tourists and locals alike to enjoy a meal or a cup of coffee in a romantic setting. The Wachenburg also houses a decent restaurant and hosts various events throughout the year.
Overall, Weinheim's Exotenwald and Wachenburg are two must-visit destinations for anyone visiting the town. The Exotenwald offers a unique opportunity to explore a vast collection of exotic trees and plants from around the world, while the Wachenburg offers breathtaking views of the surrounding area and a chance to enjoy a romantic meal or coffee in a beautiful setting. Whether you're a nature lover or a history buff, Weinheim has something to offer for everyone.
#exotenwald #park #weinheim #forest #trees #nature #wachenburg #castle #exotictrees #hiking #germany #europe
Music:
1 HOUR | "Echoes In The Canyon" | No Copyright - Flute Meditation, Relaxation, Ambient Music
von Dandelion Meditation (https://www.youtube.com/@dandelionmeditation2337)
10
views
Longdesin Road Love River Bridge Construction, episode 1 🇹🇼 (2023-02) {aerial}
Views of the construction site of the new road bridge crossing Love River, Kaohsiung City.
Longdesin Road will be extended to the east to take some traffic from Dashun Road. Piling works for the foundation on the east bank of Love River have been completed. A temporary steel bridge has been built for the site traffic. A 90 m span steel bridge will be erected across Love River. Works have started October 2022 and are scheduled to be finished April 2024.
Music:
Modern Situations by Unicorn Heads
YouTube Audio Library
3
views
Construction of Temple Extension Building, episode 2 🇹🇼 (2022-12) {aerial}
Construction of Extension Building
Dharma Drum Mountain Zi Yun Temple 法鼓山紫雲寺
Niaosong District, Kaohsiung City, Taiwan
Part 2, covers 2022-12, floors 7 and 8
Construction info:
Contractor: Ruentex Co., Ltd., New Taipei City
Architect and designer: Wen-sheng Li, Taipei City
2 floors underground, 10 above ground
The retaining structure of the construction pit is made of 23 m long concrete piles with 15 cm diameter. Groundwater level is at -5 m, bottom slab at -9 m. The building has a raft foundation. Columns, beams and facade of the building are made of precast concrete. Long span horizontal beams (~22 m) utilize steel beams in the middle section. Floor slabs are made of reinforced concrete, poured on corrugated steel sheets.
12
views
Blooming Amaryllis 🇩🇪 (2022-09) {slide show}
Views of an indoor grown Amaryllis plant blooming in red.
#amaryllis #flower #blooming
Music:
Chocolate Cookie Jam by An Jone
YouTube Audio Library
7
views
Construction of Temple Extension Building, episode 1 🇹🇼 (2022-07) {aerial}
Construction of Extension Building
Dharma Drum Mountain Zi Yun Temple 法鼓山紫雲寺
Niaosong District, Kaohsiung City, Taiwan
Part 1, covers the period from 2021-03 to 2022-07, floors B2 ~ 1F
Construction info:
Contractor: Ruentex Co., Ltd., New Taipei City
Architect and designer: Wen-sheng Li, Taipei City
2 floors underground, 10 above ground
The retaining structure of the construction pit is made of 23 m long concrete piles with 15 cm diameter. Groundwater level is at -5 m, bottom slab at -9 m. The building has a raft foundation. Columns, beams and facade of the building are made of precast concrete. Long span horizontal beams (~22 m) utilize steel beams in the middle section. Floor slabs are made of reinforced concrete, poured on corrugated steel sheets.
Chapters:
00:00 Intro
01:09 Past (aerial)
04:10 Current (images & video clips)
10:36 Current (aerial)
19:16 Outro
Credits
Music:
南無觀世音菩薩聖號 七字二音 法鼓山 剪輯2小時加長版 高清
Namo Guan Shi Yin Bodhisattva
Non-aerial images:
Followers of the Dharma Drum Mountain Buddhist foundation
19
views
Kaohsiung Station 高雄車站 under construction [episode 14] 🇹🇼 (2023-02) {aerial}
Views of Kaohsiung Station construction site in mid-February 2023, Sanmin District, Kaohsiung City, Taiwan.
#Kaohsiung #station #construction #railway #StationBuilding #TrainStation #development #publictransport #railway #infrastructure # undergroundrailway #documentary #architecture #Mecanoo #scenery #TRA #landscape #urban #aerial #uav #drone #SanminDistrict #KaohsiungCity #Taiwan #Asia
Please feel free to support this channel:
https://www.paypal.me/WalterHagemann
Stages of the (above ground visible) Kaohsiung Station 高雄車站 ongoing construction works are presented in several episodes.
Episode 14
Status as per 2023, mid February.
Lower levels of the station building can be seen in construction north of the already finished part of the station building. The bus station area saw significant progress (east of Zhandong Rd). Station access for pedestrians from the east has been opened. Canopy construction is ongoing. Road traffic flow has been changed on 2022 October, 29: Southbound traffic runs from Boai Rd via Zhanxi Rd to Zhongshan Rd. Northbound traffic runs from Zhongshan Rd via the newly opened Zhangdong Rd to Boai Rd.
This video: https://youtu.be/QK8U6z8oWUo
Episode 13
Status as per 2022, end June.
Extended construction pits can be seen north of the already finished part of the station building. One construction pit is located east of the old station building. Canopy construction is ongoing. The east-west axis canopy structure is complete.
Video: https://youtu.be/_U8mTNa8GOs
Episode 12
Status as per 2022, beginning March.
Steel frame of second tall building is complete; some floor slabs have been already concreted. Cladding of the first tall building has been (almost fully) installed. Canopy construction is ongoing (in particular at the bus station area). Construction pits can be seen north of the already finished part of the station building.
Video: https://youtu.be/8d_8X327ffg
Episode 11
Status as per 2021, end September.
Steel frame of second tall building is under construction. Shifting of the old station building to the final location has been completed (celebration event on 2021-09-26). The old building has been jacked up by 394 cm in two lifting phases. The 2500 t building has then been moved by 4.5 m horizontally northward and 57.9 m westward to its final position in the center axis of the new station. Braced excavations of construction pits are proceeding. Coverage of the station works can be found at Liberty Times Net:
https://news.ltn.com.tw/news/life/breakingnews/3616313
https://news.ltn.com.tw/news/life/paper/1475141
Video: https://youtu.be/IxkJuehwTMM
************************************************
Architect’s project website:
https://www.mecanoo.nl/Projects/project/170/Kaohsiung-Station?d=0&t=0
Architectural rendering:
https://youtu.be/xnNJcV57cGk
************************************************
Intro 00:00
Views from north 01:09
Views from south 06:09
Slides 12:15
Outro 14:23
************************************************
Music:
Roll And Drop by Jingle Punks
YouTube Audio Library
Keep On Movin' by King Canyon
Stand Up by King Canyon
Mulholland by King Canyon
Givin It Up by King Canyon
YouTube Audio Library
https://youtu.be/QkdpIMbVIO0
30
views
Eine Fahrt mit der Draisine, Episode 2/2 🇩🇪 (2022-10)
Dokumentation der Fahrt mit der Elektrodraisine (in voller Länge) von Wald-Michelbach nach Mörlenbach, Kreis Bergstrasse, Hessen, Deutschland (auf einem etwa 10 Kilometer langen Abschnitt der früheren Überwaldbahn Eisenbahnstrecke) in Echtzeit. English description below this video https://youtu.be/r_a9oC5tMXs
Heutzutage fahren nur touristische Solardraisinen auf der Normalspurnebenbahnstrecke. Jede Draisine kann maximal acht Personen befördern. Die Höchstgeschwindigkeit beträgt 15 km/h. Die Fahrzeuge werden von einem elektrischen Motor angetrieben. Der Strom wird von Akkus geliefert (die vom Stromnetz über Nacht aufgeladen werden), ebenso von Sonnenzellen auf dem Draisinendach, durch Rekuperation auf Gefällestrecken, und durch pedalgetriebene Generatoren. Das Treten der Pedale sorgt für den Vortrieb über ein elektrisches Übertragungssystem. Schnelleres Treten bedeuted höhere Fahrgeschwindigkeit. Stoppen der Pedalbewegung bedeutet Anhalten des Fahrzeugs. Vier Sitze der Draisine haben Pedale. Es gibt eine zusätzliche Handbremse und einen Ausschalter für das ganze Antriebssystem der Draisine.
Draisinen werden nacheinander von einem Ende der Strecke abgelassen mit einem Mindestabstand von 100 m. Wenn all Fahrzeuge am Ziel am Ender der Strecke angekommen sind, erfolgt die Rückfahrt auf die gleiche Weise. Es gibt zwei höhengleiche Bahnübergänge mit Signalanlagen, die per Handschalter aktiviert werden. Ausserdem gibt es noch mehrere Viehtriebübergänge und Feldwegübergänge.
Die gesetzliche Grundlage für den Betrieb dieser Bahn bildet die 'Verordnung über den Bau und Betrieb der Straßenbahnen' , abgekürzt BOStrab.
Auf der morgentlichen Hinfahrt von Mörlenbach nach Wald-Michelbach gab es ernsthafte Traktionsprobleme an zwei Stellen durch durchdrehende Antriebsräder. Wahrscheinlich waren die Schienen vom herbstlichen Morgentau feucht. Zusätzlich war die Draisine nur mit drei Personen besetzt, was einen guten Rad/Schiene Kontakt beeinträchtigt haben mag. Herbeitelefonierte Mitarbeiter der Überwaldbahn gGmbH haben durch händische Schiebehilfe Unterstützung geleistet.
Kapitel
00:00:00 Einleitung
00:00:55 Abfahrt vom Solardraisinenbahnhof Wald-Michelbach um 15 Uhr, Streckenkilometer 9,66
00:04:56 Waldmichelbacher Tunnel, Streckenkilometer 8,20 (Länge 679 m)
00:10:34 Bahnübergang Kreidach, Mörlenbacher Strasse
00:11:32 Ehemaliger Haltepunkt Kreidach, Streckenkilometer 7,87
00:13:59 Bahnübergang Kreidach, Talweg
00:14:43 Kreidacher Viadukt, Streckenkilometer 7,30 (Länge 80 m)
00:16:08 Bahnübergang Kreidacher Weg
00:24:36 Mackenheimer Tunnel, Streckenkilometer 5,40 (Länge 64 m)
00:26:46 Mackenheimer Viadukt, Streckenkilometer 5,00 (Länge 73 m)
00:34:58 Vöckelsbacher Viadukt, Streckenkilometer 3,70 (Länge 135 m)
00:37:29 Weiherer Viadukt, Streckenkilometer 3,20 (Länge 26 m)
00:41:22 Ehemaliger Haltepunkt Weiher, Streckenkilometer 2,63
00:42:36 Bahnübergang Weiher Bahnhofstrasse
00:49:28 Passieren der Strassenbrückenbaustelle (B38 Umfahrung Mörlenbach)
00:54:33 Bahnübergang Mörlenbach, Panoramastrasse, Streckenkilometer 0,30
00:55:29 Ankunft am Solardraisinenbahnhof Mörlenbach, Streckenkilometer 0,00
00:57:13 Ausleitung
Geschichte der Überwaldbahn
Die Überwaldbahn ist eine Normalspur-Nebenbahnstrecke, die ursprünglich von Mörlenbach über Weiler, Kreidach, Wald-Michelbach, Unter-Wald-Michelbach, Aschbach, und Affolterbach nach Wahlen führte. Der Betrieb begann 1901. Die hügelige Landschaft erforderte den Bau von zwei Tunneln und von drei grösseren und zwei kleinen Viadukten. Die Strecke hatte Anschluss an die Eisenbahnstrecke Weinheim - Fürth im Bahnhof Mörlenbach. Es gab auf der gesamten Strecke Güter- und Personenverkehr bis 1. März 1984. An diesem Tage endete der Zugbetrieb auf dem Abschnitt Unter-Wald-Michelbach - Wahlen und das Gleis wurde im folgenden Jahr abgebaut und die Strecke wurde im Jahr 2000 in einen Radweg umgewandelt. Der Betrieb auf dem Abschnitt Mörlenbach - Wald-Michelbach wurde am 31 March 1994 eingestellt. Der Betrieb der Touristendraisine wurde am 18. August 2013 aufgenommen, nachdem viel Geld in die Ertüchtigung der Strecke gesteckt worden war.
Weitere Informationen:
https://www.solardraisine-ueberwaldbahn.de
https://www.youtube.com/@solardraisineuberwaldbahn332
https://de.wikipedia.org/wiki/%C3%9Cberwaldbahn
https://www.morr-siedelsbrunn.de/%C3%BCberwald/die-%C3%BCberwaldbahn/
Musik:
The Moon Drops by Nathan Moore
YouTube Audio Library
#solardraisine #Mörlenbach #Waldmichelbach #Überwaldbahn #Odenwald #Hessen #Deutschland #railway #handcar #tourism #nature #forest #indiansummer #landmark #germany #europe
9
views
Uncovering the Secrets of Taiwan's Kaohsiung Neiwei Market! 🇹🇼 (2023-01)
Views of Neiwei Market 鼓山第三市場(內惟市場), Gushan District, Kaohsiung City, Taiwan.
Don't miss 祺 胡椒餅: pepper cake, scallion biscuits and shortbread.
Note: People are wearing face masks with no mandate for that being in place.
#traditionalmarket #taiwanesefood #kaohsiung #streetfood #taiwan #asia
9
views
2023 Kaohsiung Lotus Pond Lantern Festival 🇹🇼 (2023-01)
Views of the 2023高雄蓮池潭燈會Kaohsiung Lotus Pond Lantern Festival 《光舞蓮潭-水上燈光展演》, Zuoying District, Kaohsiung City, Taiwan.
Duration: 2023-01-26 ~ 2023-02-05
#yearoftherabbit2023 #lanternfestival #lotuspond #kaohsiung #taiwan #lunarcalendar
6
views
Cijin Island 旗津島 🇹🇼 (2022-07) {aerial}
Views of Cijin Island 旗津島, Qijin District, Kaohsiung City, Taiwan.
#cijin #beach #kaohsiung #aerial #ocean #aerial #uav #drone #qijindistrict #kaohsiungcity #asia
Sights:
Cijin Windmill Park 旗津風車公園
Huantaipingyang Park 環太平洋公園
Cijin District Office Building 高雄市政府社會局 旗津社福中心
Campground 露營樂2號店(狩獵帳)-旗津豪華露營區
Cijin Tiensheng Temple 旗津天聖宮
Cijin Beach 旗津海水浴場
Music:
Pale Tussuck by Pictures of the Floating World
Attribution-ShareAlike 4.0 International (CC BY-SA 4.0)
https://creativecommons.org/licenses/by-sa/4.0/
https://freemusicarchive.org/music/Pictures_of_the_Floating_World/garden-tigers
The Sound of a Dollar by DJ Williams
YouTube Audio Library
Tiger's Blood by DJ Williams
YouTube Audio Library
69 Bronco by DJ Williams
YouTube Audio Library
The Take Down by DJ Williams
YouTube Audio Library
Dorris Day by DJ Williams
YouTube Audio Library
12
views
Urban Meadow Mowing 🇹🇼 (2022-12) {aerial}
Views of a tractor mowing a meadow in urban Kaohsiung City.
#agriculture #meadow #mowing #hay #scenery #aerial #kaohsiung #taiwan #asia
Music:
This is not a ballad by True Cuckoo
YouTube Audio Library
10
views
A walk in the township of Wald-Michelbach 🇩🇪 (2022-10)
Views of the township of Wald-Michelbach, Bergstrasse District, Hesse, Germany. Impressions were gathered on a sunny day in fall after arriving by handcar on the Überwald railway track.
#Odenwald #village #autum #walk #sightseeing #slideshow #rural #scenery #waldmichelbach #hesse #germany #europe
Music:
Brandenburg Concerto No4-1 BWV1049 - Classical Whimsical by Kevin MacLeod is licensed under a Creative Commons Attribution 4.0 license. https://creativecommons.org/licenses/by/4.0/
Source: http://incompetech.com/music/royalty-free/index.html?isrc=USUAN1100303
Artist: http://incompetech.com/
6
views
Company Housing Complex 🇹🇼 (2022-06) {aerial}
Views of blocks of flats at Nanzih District, Kaohsiung City, Taiwan. The five-storeyed apartment buildings were accommodating employees of a nearby oil refinery complex.
#housing #architecture #kaohsiung #scenery #landscape #aerial #uav #drone #NanzihDistrict #KaohsiungCity #Taiwan #Asia
Music:
Ice & Fire by King Canyon
YouTube Audio Library
Mulholland by King Canyon
YouTube Audio Library
6
views
Old City of Fengshan County 鳳山縣舊城 🇹🇼 (2022-06) {aerial}
Aerial footage of the Old City of Fengshan 鳳山縣舊城, Zuoying District, Kaohsiung City, Taiwan.
#oldcity #zuoying #kaohsiung #taiwan #citywall #gate #landmark #landscape #scenery #drone #uav
Chapters:
00:00 Intro
00:35 East Gate (Fengyi Gate) 鳳山縣舊城 東門(鳳儀門)
04:37 South Gate (Ciwun Gate) 南門(啟文門)
07:22 Turtle Mountain 龜山
08:26 Military Dependents Village
09:23 Dragon and Tiger Pagodas 龍虎塔
09:46 North Gate (Gongchen Gate) 鳳山縣舊城 北門(拱辰門)
11:38 Still Images
16:11 Outro
Music:
Intellect by Yung Logos
YouTube Audio Library
Silver Waves by Track Tribe
YouTube Audio Library
By the Fireplace by Track Tribe
YouTube Audio Library
Smokey's Lounge by Track Tribe
YouTube Audio Library
Moonlight Sonata by Beethoven
YouTube Audio Library
6
views
A ride with the handcar, episode 1/2 🇩🇪 (2022-10)
Real time full length footage of a ride on the handcar from Mörlenbach to Wald-Michelbach, Bergstrasse District, Hesse, Germany (on an about 10 km section of the former Überwald railway line).
Nowadays, only tourist solar handcars operate on the standard gauge track. Each handcar can carry a maximum of eight people. The maximum speed is 15 km/h. The vehicles are powered by an electric motor. Electricity is supplied by rechargeable batteries (recharged from the grid overnight), solar panels on the roof, recuperation at downhill sections, and by pedal-powered generators. The pedaling action of the driver creates propulsion via an electric drivetrain system. Faster pedaling means higher driving speed. Stopping to pedal stops the vehicle. Four seats are equipped with pedals. There is an additional handbrake and an off-switch for the whole system.
Handcars leave from one end of the line one after the other with a minimum headway of 100 m. When all cars have reached the destination at the end of the line they can take the trip back in the same way. There are two level crossings with signals that have to be triggered manually. Several cattle crossings and farm road crossings are just indicated by signage.
The legal regulation for operation of this railway is the 'Verordnung über den Bau und Betrieb der Straßenbahnen' ("Regulation on the Construction and Operation of Light Railways"), abbreviated as BOStrab.
We faced serious skidding of the wheels at two locations. Probably the rails were still wet from autumnal morning dew that created traction problems. In addition, there were only three persons on board the vehicle preventing firm wheel/rail contact. Staff of the rail operator provided support by manually pushing the handcar.
Chapters
00:00:00 Intro
00:01:14 Departure from 'Mörlenbach' solar handcar station at a quarter past eleven
00:02:05 Level crossing 'Panoramastrasse' at 0.30 km
00:06:20 Passing of road overpass construction site (B38 Mörlenbach bypass)
00:14:15 Traction problems (skidding)
00:16:30 Former stop 'Weiher' at 2.63 km
00:17:50 Traction problems (skidding)
00:41:10 Viaduct 'Weiher' at 3.20 km (length 26 m)
00:43:15 Viaduct 'Vöckelsbach' at 3.70 km (length 135 m)
00:52:35 Viaduct 'Mackenheim' at 5.00 km (length 73 m)
00:54:20 Tunnel 'Mackenheim' at 5.40 km (length 64 m)
01:03:05 Viaduct 'Kreidach' at 7.30 km(length 80 m)
01:04:15 Level crossing 'Talweg'
01:06:05 Former stop 'Kreidach' at 7.87 km
01:06:40 Level crossing 'Mörlenbacher Strasse'
01:08:00 Tunnel 'Waldmichelbach' at km 8.20 (length 679 m)
01:15:00 Arrival at 'Waldmichelbach' solar handcar station at 9.66 km
01:16:35 Outro
History of the Überwald railway
The Überwaldbahn is a standard gauge spur line running originally from Mörlenbach via Weiler, Kreidach, Wald-Michelbach, Unter-Wald-Michelbach, Aschbach, and Affolterbach to Wahlen. It started operation in 1901. The hilly topography required construction of two tunnels and three larger and two small viaducts. It was connected to the railway line Weinheim - Fürth at Mörlenbach station. The complete line had freight and passenger traffic until March 1, 1984. At that date train operation ceased on the Unter-Wald-Michelbach - Wahlen section and the track was disassembled the following year and the alignment was converted into a bicycle path in the year 2000. The section Mörlenbach - Wald-Michelbach was closed on March 31, 1994. The tourist handcar operation commenced on August 18, 2013 after a hefty investment in track refurbishment.
Links
https://www.solardraisine-ueberwaldbahn.de
https://www.youtube.com/@solardraisineuberwaldbahn332
https://de.wikipedia.org/wiki/%C3%9Cberwaldbahn
Music:
The Moon Drops by Nathan Moore
YouTube Audio Library
#solardraisine #Mörlenbach #Waldmichelbach #Überwaldbahn #Odenwald #Hessen #Deutschland #railway #handcar #tourism #nature #forest #indiansummer #landmark #germany
37
views
3D Digital Billboard 🇹🇼 (2022-12) [episode 3]
Latest 3D digital billboard show with a Christmas intro.
#3d #Billboard #Kaohsiung #digital #screen #LED #anamorphic #illusion #marketing #commerce #animation #ShoppingMall #scenery #architecture #ESkyMall #ESkyLand #義享時尚廣場 #義享天地 #GushanDistrict #KaohsiungCity #Taiwan #Asia
https://www.esky-mall.com.tw/
[22.656605, 120.306074]
Channel support:
https://www.paypal.com/paypalme/WalterHagemann
Chapters:
00:00 Christmas Intro
01:40 3D digital billboard
03:30 Outro
04:00 Raw footage
Music:
We Wish You A Merry Christmas by DJ Williams
YouTube Audio Library
Tropic by Anno Domini Beats
YouTube Audio Library
Anno Domini Nation - Home of the beat
https://annodominination.com
6
views
Former TRA Railway Kaohsiung Workshop 🇹🇼 (2022-06) {aerial}
Footage of the former TRA railway workshop, Fengshan District, Kaohsiung City, Taiwan.
#railway #workshop #kaohsiung #history #landmark #maintenance #scenery #depot #architecture #urban #aerial #uav #drone #documentary #fengshandistrict #kaohsiungcity #taiwan #asia
Music:
When You're Not Looking by Nathan Moore
YouTube Audio Library
New Dawn by Benjamin Tissot
Royaty Free Music: Bensound.com
9
views
Hongmaogang Cultural Park 紅毛港文化園區 🇹🇼 (2022-06) {aerial}
Views of South Harbor Entrance & Hongmaogang Cultural Park 紅毛港文化園區 , Siaogang District, Kaohsiung City, Taiwan. Admission has to be paid to enter the cultural park. Sights: Pyramid Tower Revolving Restaurant, exhibition hall, outdoor exhibition area, sky walk, pier and waiting room, ocean front platform, ship traffic in and out the harbor.
In 2007, the Hong Mao Gang Village was relocated from the original site in Siaogang District to make a way for Port of Kaohsiung Intercontinental Container Terminal. Using a small lot of land, the cultural park was established there at the southern entrance of the harbor. It was opened in June 2012. The Hongmaogang settlement has a history of 400 years.
#Hongmaogang #Kaohsiung #Taiwan #museum #landmark #history #village #architecture #harbor #ocean #aerial #uav #drone #landscape #scenery #asia
Chapters:
00:00 Intro
00:50 Approach
01:37 Views
10:02 Still images
14:53 Outro
Credits:
Pray by Anno Domini Beats
YouTube Audio Library
Fruits of Life by Jimena Contreras
YouTube Audio Library
Chiapas Marimba by Jimena Contreras
YouTube Audio Library
World's Sunrise by Jimena Contreras
YouTube Audio Library
Purepecha Landscape by Jimena Contreras
YouTube Audio Library
Fiesta Jarocha by Jimena Contreras
YouTube Audio Library
19
views
Qianzhen Ferry 前鎮輪渡 🇹🇼 (2022-07)
Taking Qianzhen Ferry from Qianzhen District to Qijin District, Kaohsiung City, Taiwan. Sailing through eastern part of Kaohsiung harbor to Cijin Island.
#ferry #island #port #travel #vessel #ship #ocean #kaohsiungcity #taiwan #asia
Credits:
Pineapple Rag by Scott Joplin
Played by Fabricio André Bernard Di Paolo (Lord Vinheteiro)
5
views
Kaohsiung Port Cruise Terminal 高雄港埠旅運中心 🇹🇼 (2022-07) {aerial}
Views of Kaohsiung Port Cruise Terminal 高雄港埠旅運中心, Lingya District, Kaohsiung City, Taiwan.
Impressions of this new cruise ship terminal and port service center just prior to completion are provided here. The building has 15 floors above ground and 2 floors underground, with a 730-meter-long pier shoreline. It will be able to serve the world's largest 225,000-ton cruise ship, and the peak passenger clearance capacity will be 2,500 people per hour. There are also duty-free shops, entry and exit halls, viewing platforms, restaurants, multi-functional business meeting facilities, offices of Taiwan Port Corporation, etc.
Principals: Jesse Reiser + Nanako Umemoto
Design Team: Neil Cook, Michael Overby, Juan De Marco, Kris Hedges, Eleftheria Xanthouli, John Murphy, Joy Wang, Hilary Simon, Massimilano Orzi, Toshiki Hirano, Ryosuke Imaeda, Xian Lai, Jasmine Lee, Emily Cass, Sonia Flamberg, Fan Wu, Xian Lai, Ana Morris, Sylvia Lee, Devin Jernigan, Michal Golinski, Leigh Jester, Libby Dierker, Sonya Chao, Ana Untiveros-Ferrel, Erin Kelly, Robert Cha, Alan Kwan
Structural Engineer: Ysrael A. Seinuk, PC (Schematic Design); Supertech Consultants International
Mechanical Consultant: IsLin & Associates Consulting
Port Planning and Logistics: ARUP Hong Kong
Facade Consultant: Meinhardt Facade Technology, Hong Kong
Lighting Consultant: Izumi Okayasu Lighting Design Office
Architect of Record: Fei and Cheng and Associates
Further information:
https://www.archdaily.com/96053/kaohsiung-port-terminal-reiser-umemoto
https://www.reiser-umemoto.com/reiser-umemoto-selected-projects/kaohsiung-port-terminal
#port #cruise #terminal #kaohsiung #taiwan #architecture #infrastructure #travel #shipping #harbor #aerial #uav #drone #asia
Music:
Tinker Time by Nathan Moore
YouTube Audio Library
Here It Comes by Track Tribe
YouTube Audio Library
No Mercy by Track Tribe
YouTube Audio Library
Last Train North by Track Tribe
YouTube Audio Library
26
views