Brown03

Brown03

    35. All of the following are tools
    0:08
    the case of early termination of
    0:09
    verification is generally carried
    0:08
    documentation. Asking the
    0:08
    Scope configuration control and
    0:09
    Work breakdown structure and
    0:09
    following except: Initial scope
    0:08
    the project team should confirm
    0:10
    present in all overall
    0:13
    projects All projects should support the
    0:09
    audits can be categorised by
    0:08
    utility models and designs. The
    0:09
    rights ification mts trade name rights)
    0:09
    achievements (including patent
    0:10
    1、Change of qualification
    0:11
    Accumulation and promotion of
    0:09