1. Day 15 laundry door installed, some wall rot, can't get rid of the turkeys

    Day 15 laundry door installed, some wall rot, can't get rid of the turkeys

    3
    0
    76
  2. Day 16 bathroom floor done, siding off front wall, more termite damage

    Day 16 bathroom floor done, siding off front wall, more termite damage

    6
    0
    115
  3. Day 17 backboard by fireplace gone, kitchen windows installed

    Day 17 backboard by fireplace gone, kitchen windows installed

    4
    0
    87
  4. Day 26 bed and bath light wiring, started laying down sub floor

    Day 26 bed and bath light wiring, started laying down sub floor

    4
    0
    82
    1
  5. Day 29 smoke detectors wired, bathroom fan, oven vent installed, insulation baffles started

    Day 29 smoke detectors wired, bathroom fan, oven vent installed, insulation baffles started

    4
    0
    94
  6. Day 31 surround sound conduit, laid some subfloor, ripped up kitchen flooring

    Day 31 surround sound conduit, laid some subfloor, ripped up kitchen flooring

    4
    0
    94
  7. Day 37 Kitchen, dining, living room and both bathrooms ceiling drywall

    Day 37 Kitchen, dining, living room and both bathrooms ceiling drywall

    4
    0
    88
  8. Day 45 last window installed, siding going up, trees planted, worms sprayed

    Day 45 last window installed, siding going up, trees planted, worms sprayed

    4
    0
    104
    1