1. S2 EP63 | OFF GRID TIMBER FRAME CABIN | WOODWORK | FINSIHING INSULATION AND FLOORING MATERIAL

    S2 EP63 | OFF GRID TIMBER FRAME CABIN | WOODWORK | FINSIHING INSULATION AND FLOORING MATERIAL

    12
  2. TIMBER OIL FOR THE FRONT PORCH | BEGINNING KITCHEN CABINETS | OFF GRID CABIN HOMESTEAD

    TIMBER OIL FOR THE FRONT PORCH | BEGINNING KITCHEN CABINETS | OFF GRID CABIN HOMESTEAD

    14
  3. Timber Frame Timbers From Our Own Woods?

    Timber Frame Timbers From Our Own Woods?

    4
    0
    22
  4. S2 EP25 | WOODWORK | TIMBER FRAME BASICS | FINISHING THE POST FOR THE CABIN PURLINS

    S2 EP25 | WOODWORK | TIMBER FRAME BASICS | FINISHING THE POST FOR THE CABIN PURLINS

    16
  5. S1 EP7 | TIMBER FRAME BASICS | PREPARING POST & BEAM WITH TRADITIONAL HAND TOOLS

    S1 EP7 | TIMBER FRAME BASICS | PREPARING POST & BEAM WITH TRADITIONAL HAND TOOLS

    8
  6. S1 EP16 | WOODWORK | TIMBER FRAME BASICS | FOUNDATION LAYOUT AND FIRST POST AND BEAM FOR THE CABIN

    S1 EP16 | WOODWORK | TIMBER FRAME BASICS | FOUNDATION LAYOUT AND FIRST POST AND BEAM FOR THE CABIN

    2
    0
    15
  7. Timber Creek Ruger 10/22 Extended Magazine Release

    Timber Creek Ruger 10/22 Extended Magazine Release

    9
    0
    276
    6
  8. Building a DIY Tiny Cabin with a Loft | Prepping for Our Loft

    Building a DIY Tiny Cabin with a Loft | Prepping for Our Loft

    22
    1
  9. S2 EP66 | OFF GRID TIMBER FRAME CABIN | WOODWORK | LOGGING FOR EXTERIOR CABIN WALLS

    S2 EP66 | OFF GRID TIMBER FRAME CABIN | WOODWORK | LOGGING FOR EXTERIOR CABIN WALLS

    18
  10. S2 EP23 | WOODWORK | TIMBER FRAME BASICS | HAULING LOGS FOR THE CABIN SIDING

    S2 EP23 | WOODWORK | TIMBER FRAME BASICS | HAULING LOGS FOR THE CABIN SIDING

    28
  11. S2 EP68 | OFF GRID TIMBER FRAME CABIN | WOODWORK | PLACING ANGLE IRON ON UPPER POST & BEAM | HANDMAD

    S2 EP68 | OFF GRID TIMBER FRAME CABIN | WOODWORK | PLACING ANGLE IRON ON UPPER POST & BEAM | HANDMAD

    22
  12. Hydraulic Log Splitter BUILD Part 1 - Steel Frame Fabrication & Sourcing Parts

    Hydraulic Log Splitter BUILD Part 1 - Steel Frame Fabrication & Sourcing Parts

    79
  13. S2 EP48 | OFF GRID TIMBER FRAME CABIN | INSTALLING MOISTURE BARRIER & FLOOR JOIST

    S2 EP48 | OFF GRID TIMBER FRAME CABIN | INSTALLING MOISTURE BARRIER & FLOOR JOIST

    12
  14. Setting Out the Frame - Part 3: Oak Casement Window

    Setting Out the Frame - Part 3: Oak Casement Window

    5
    0
    6
  15. S2 EP65 | OFF GRID TIMBER FRAME CABIN | WOODWORK | CONTINUING CABIN FLOORING & GIVEAWAY

    S2 EP65 | OFF GRID TIMBER FRAME CABIN | WOODWORK | CONTINUING CABIN FLOORING & GIVEAWAY

    11
  16. S2 EP71 | TIMBER FRAME CABIN | WOODWORK | INSTALLING VENTING FOR WOOD STOVE

    S2 EP71 | TIMBER FRAME CABIN | WOODWORK | INSTALLING VENTING FOR WOOD STOVE

    10