Drone captures stunning overhead footage of Killer Whale pod
A drone captures absolutely stunning HD footage of a Killer Whale (Orca) pod in Punta Ninfas, Chubut, Argentina. What an incredible sight!
113K
views
15
comments
Drone footage captures amazing oasis in Peru
The Huacachina Lagoon is an oasis located five kilometers west of the Peruvian city of Ica, in the middle of the coastal desert of the Pacific. Emerald green waters have risen due to the up-welling of underground streams, with an abundant vegetation composed of palms, eucalyptus (introduced species) Huarango carob, which serves the migratory birds that pass through this region. Check out this stunning drone footage of one of the most spectacular and beautiful places on the Peruvian coast.
53.2K
views
2
comments
Drone captures nostalgic footage of Villa Epecuén
Villa Epecuén was a tourist village in the Buenos Aires Province, Argentina until it flooded in 1985 and was abandoned. Its ruins are on the eastern shore of the Laguna Epecuén, about 7 kilometres north of the city of Carhué. This incredible drone footage captures some breathtaking images of what remains of this historic location.
38.3K
views
Stunning drone footage exhibits Inca Trail in Peru
Trekking on the Inca Trail in Peru will reward you with a stunning view of the region’s ruins. This drone footage shows just how incredible the area truly is.
17.2K
views
Amazing drone footage of Iberá Wetlands in Argentina
The Iberá Wetlands are a mix of swamps, bogs, stagnant lakes, lagoons, natural slough and courses of water in the center and center-north of the province of Corrientes, Argentina. Iberá is one of the most important fresh water reservoirs in the continent and the second-largest wetland in the world after Pantanal in Brazil.
1.09K
views
1
comment